24 sept. 2010:
-new tast about assemble the domesday.
- i'm registed in section E and in sector 4.
- in section E, i had to cut 2 poles in the size of 2.59m in length each.

pic 1: reed selection process..

pic 2: pull out the bamboo process..

pic 3: measuring the diameter of the reeds..

pic 4: measuring the length of bamboo..

pic 5: bamboo cutting process..

pic 6: the process of making bamboo joinery..

pic 7: PVC cutting and forming process..
pic 8: PVC heating process..
pic 9: the process of a making hole in the ready-shaped PVC..
pic 10: results of the completed strut..

pic 11: first trial of BIG dome assembly..

No comments:
Post a Comment